Paving Quality Acceptance and Quality Control Forms
Ministry Forms
The Quality Acceptance and Field Lab Reports are Excel spreadsheets developed by the Ministry Field Services and are meant to be used by the Ministry Representative on End Product Specification paving projects.
The Quality Acceptance Reports are to be used in conjunction with The Ministry of Transportation's End Product Specification Appendix 502 EPS Version 6.0 (February, 2003).
The Quality Acceptance Reports are used to determine acceptance and/or rejection of asphalt pavement produced by Contractors working on End Product Specification paving projects.
Quality Acceptance Forms and the Field Lab Report, provided by the links below, should be downloaded, filled in, and printed out by the Ministry Representative, and then provided to the contractor:
| Title |
Description |
EPS-QA1.xls |
This Quality
Acceptance Report contains:
- Sub Lot Calculations
- Acceptance and Payment Adjustment for Density
- Payment Adjustment for Asphalt Content
- Acceptance and Payment Adjustment for Aggregrate Gradation
- Payment Adjustment for Material Application Rate
- Lot Adjustment Summary: Density, Asphalt Content, Application Rate & Segregation
|
EPS-QA2.xls |
This Quality
Acceptance Report contains:
- Segregation Payment Adjustment
- Lot Assessment and Payment Adjustments for Smoothness
- Lot Adjustment Summary: Segregation and Smoothness
|
EPS-FLR.xls |
This Field Lab
Report contains:
- Degree of Compaction from Test Cores
- Mechanical Analysis of Aggregates & Determination of Asphalt Content
- Mechanical Analysis of Aggegrates
- Ignition Oven Calibration
- Field Lab Summary
|
Contractor Forms
The Quality Control Form is
an Excel spreadsheet jointly developed by the Ministry Field Services and BC Roadbuilders
Association, and is meant to be used by the paving contractor on End Product Specification
paving projects.
The Quality Control Form provided by the link below, should be downloaded, filled in, and printed out by the
contractor, and then provided to the Ministry Representative:
| Title |
Description |
|
EPS-QC1.xls |
This Quality
Control Report contains:
- Seive Analysis Worksheet
- EPS Result: Daily Paving Report
- Road Checkers Daily Summary
- Daily Scale Summary
- Consecutive 4 Test Average (% Paving)
- Asphalt Materials Record
|