1.01.04.06 Utility Right of Way in Subdivisions

Utility Right of Way in Subdivisions

If road dedication takes place over a utility right of way, the utility as holder of the right must sign the final plan.  The applicant is responsible for obtaining the signature and paying all costs associated with obtaining it.