The major works to be carried out on this project are: Roadway and Drainage
Excavation (Stripping 25,000 m3, Type D Excavation 105,000 m3, Unsuitable Material
21,000 m3), SGSB Surcharge (62,000 m3), Granular materials (94,000 m3), Asphalt
Paving (27,200 tonnes), Drainage Pipes (2,000 m), Watermains (1,100 m), Fencing
(4,000 m), Electrical (Signal and 22 Luminaires), Signing (128 Signs), Precast Concrete
Barriers (1350 m) and Relocation of Mini-Storage Office/Residential Structure Building. |