| Description: |
Supply and install 1560m2 of slope mesh, 120 metres of rock bolts, 15 cubic metres of shotcrete and rock blasting to excavate 200m3. Supply and install a 100 metre long, 4 metre high cable net catch fence, with a energy level capacity of 1500kJ, for rockfall portection. |