WR Bennett Bridge Construction Cams
You are viewing the most current images from the WR Bennett Bridge construction sites. These images are refreshed every 15 minutes. To view larger, high-definition images with a wide variety of controls and features, click the "Control" links on the left, or the images themselves.
Bridge Cam
Work on the new WR Bennett Bridge began in 2006, and is expected to open in 2008. Like the original Okanagan Lake Bridge, the new structure will be one of the few floating bridges in North America.
Graving Dock Cam
In July 2005 SNC-Lavalin began construction of this graving dock north of Bear Creek Provincial Park, where the bridge pontoons will be built, then floated into position.
NOTE: A current version of the Adobe Flash Viewer plugin will be required to use the Construction Cam image controls. Upgrades are available from Adobe
|