Kinsol Trestle - Risk Associated with Leaving the Trestle in its Present Condition for 18 Months prior to Demolition
Report by McCall Engineering Ltd. for B.C. Ministry of Transportations, June 12, 2006
Assessment of the risks associated with leaving the Kinsol timber trestle in its present condition for approximately 18 months.
Report (PDF 140 KB)
|
|
|
Kinsol Trestle - Review of Report and Proposed Timber Trestle Reconstruction
Report by McCall Engineering Ltd. for B.C. Ministry of Transportations, February 06, 2006
Review of the Kinsol timber trestle report and reconstruction method. Includes discussions on accuracy, any overlooked issues, potential modifications to the design and the risks associated with leaving the structure in its present condition.
Report (PDF 180KB)
|
 |
|
|