| Description: |
The project includes grading, pulverizing, superpave, curb & gutter, sidewalks, boulevards, and electrical Type "D" excavation 108,710 m3; Type "A" excavation 1,680 m3; SGSB 24,130 m3; 25mm WGB 25,410 m3; 7,550 m2 concrete sidewalk; Catch basin and manhole installations; Pulverize existing pavement 54,640 m2; Primer and tack coat 87,330 L; 28,590 t superpave; 5,340 m curb and gutter; Electrical works including installation of roadway lighting, modify existing traffic signals; install traffic loops. |