
Whistler Wastewater Treatment Plant Upgrade
UPDATE
SECOND INTAKE FOR BCF-CC APPLICATIONS IS NOW CLOSED
Applications for funding under the Building Canada Fund - Communities Component are no longer being accepted. The program received over 470 applications during the second intake. The review of these applications is currently underway.
Prior to completing the On-Line Shared Information System for Infrastructure (SIMSI) application, please read the following guides:
- British Columbia Provincial Program Guide
The appropriate Category Specific Supplement and the required forms (only required for drinking water, wastewater, green energy, and solid waste management projects)
- Drinking Water and form
- Wastewater and form
- Public Transit
- National Highway System
- Green Energy and form
- Solid Waste Management and form
- Brownfield Redevelopment
- Culture
- Sport
- Connectivity & Broadband
- Local Road
- Shortline Railways
- Short Sea Shipping
- Local & Regional Airports
- Tourism
(convention centres or exhibition hall-type facilities projects) - Collaborative Projects
- Disaster Mitigation
- Recreation
- Flood Protection
- Flood Protection Program Guide
These guides contain the critical information required to successfully complete and submit an application under the Building Canada Fund – Communities Component (BCF-CC). Please ensure that your application contains the necessary information outlined in these documents.
The above documents are to be used in combination with the:
In addition to the SIMSI on-line application, all applicants must complete, print, sign and mail in the authorization/certification page of the application form to the lead ministry. See contact us page for mailing address.
For more information see the Application Process Flow Chart.
